checking-mark-100-small

240 t/h
of material treated

checking-mark-100-small

300 m³/h
water flow rate

checking-mark-100-small

18 t/h
of solids to the filter press

Now part of the Heidelberg Group, Cava Nord is based in Paderno Dugnano and operates in Lombardy’s quarrying sector, supplying aggregates to the Milan construction market. The site is managed according to an integrated life-cycle approach: alongside aggregate extraction, excavated areas are progressively restored through controlled backfilling with certified materials, followed by agricultural or natural restoration. Groundwater protection and soil stability are managed through dedicated operating protocols, while closed-loop water management reduces freshwater abstraction and wastewater discharge.

TecnoideaImpianti-cava-nord

The project challenges

1-100

Volume management

Up to 400 m³/h of highly turbid water had to be treated.

2-100

Footprint constraints

The new plant had to be integrated into the existing quarry layout within a limited footprint.

3-100

Immediate operation

The client required a fully tested turnkey plant ready for rapid on-site commissioning.

Tecnoidea’s process-engineering approach

Tecnoideaimpianti-chiarificatori-cavanord

Twin vertical clarifiers with load balancing

To reduce the footprint while keeping the overall plant height within the available limits, the turbid-water flow is split between two separate static vertical clarifiers. A flow splitter balances the hydraulic load using real-time level data from the LEM sludge-level monitoring system installed in the clarifiers

tecnoideaimpianti-filtropressa-cavanord

Filter press sized with reserve capacity

An overhead-beam filter press (model FPTA 1300/100/30) was selected, equipped with four pistons in a full-traction configuration. The machine was sized to handle up to twice the actual sludge flow rate from the aggregate-washing plant.

Tecnoideaimpianti-vascafanghi-cavanord

Sludge tank

A dedicated sludge tank was added to provide additional buffer capacity downstream of the static clarifiers, helping stabilise filter-press operation.

Results

Space optimisation

The water and sludge treatment plant uses a compact vertical layout, accommodating the complete treatment process within a footprint of just 260 m².

Closed loop

The plant recovers 3,000 m³ of treated water per day, all of which is reused in the aggregate-washing process.

High-volume sludge management

The plant produces 200 t/day of thickened sludge for subsequent filter-press dewatering.

Spadeable filter cakes

The dewatering process produces 120 m³/day of spadeable filter cakes.